Streamline Mechanical started work on the Long Lake Project in 2005 installing sewer, water and gas lines as a subcontractor to ATCO Structures Ltd.. At that time, our project workforce comprised 8 workers, including; operators, labourers and plumber/gasfitters. As the project scope expanded and demands for maintenance services increased, Streamline was successful in obtaining a direct contract with Nexen Inc. (Nexen) Site Wide Shared Services (SWSS) to perform general site maintenance. During this time we worked with several other contractor companies on-site and successfully completed several projects for Nexen and OPTI Canada Inc. (OPTI). In May 2008, Streamline peaked at a workforce on-Site of 75 employees. Our contract ended in the spring of 2010.
Our work activities associated with the Long Lake Project are listed as follows:
- Construction of Snow Storage Facility
- Final grading at water block, steam block, cogen and debottlenecking areas (i.e., drainage, sub-grade preparation, surface gravelling and culvert installation)
- Water well final grading (i.e., stripping top soil, place compacted clay fill, sub-grade preparation, compacted surface gravel, electrical skid piling, excavation and backfill for underground electrical and well hut installation)
- Tank farm final grading (i.e., sub grade preparation, surface gravel, preparation for HDPE liner installation and backfill of liner, sump installation and installation of precast concrete containment walls)
- Truck-out terminal construction (i.e., clay fill compaction, large diameter culvert installation and placement of compacted surface gravel)
- Excavation and backfill for underground electrical throughout plant site
- Final grading on Well Pads
- Excavation and backfill for concrete foundations
- Road maintenance, cold mix relay, dust control and snow removal
- Dewatering
- Construction of crane pads for heavy lifts
- Transportation and setup of sea-cans, wash-cars, lunch and office trailers
- Maintenance on wash-cars.
- Final grading of total upgrader site: drainage ditch excavation, culvert installation, sub-grade preparation and compacted surface gravelling
- Installation of concrete holding tanks for sewer and water at wash-cars
- Excavation for underground electrical services
- Placement of jersey barriers
- Gravel hauling
- Install, clean and service furnaces
- Install radiant tube heaters
- Pipe fusion in various locations on site
- Remove and re-install roof from compressor building in plant
- General maintenance of trailers and buildings (i.e., leveling, repairing doors, installing new hardware, locks, exhaust fans, repair frozen water/sewer lines, located and repair leaking gas lines, maintain wash cars, etc.)
- Excavate and repair fire hydrants and post indicator valves
- Install and remove various lift stations and sewer risers
- Install exhaust fans in waste treatment plant
- Mobilize and demobilize trailers, multi unit complexes and camp facilities
- Constructed wash bay and washed client and contractor vehicles
- Road and parking lot construction
- Ditch work – laid sod and installed culverts
- Snow removal and plumbing services over holiday periods to ensure the site is maintained for when workers return
- Repairs to vehicles and miscellaneous work by mechanics in shop
|